Fairport Engineering Ltd is based in Lancashire, UK and has been in business over 30 years servicing heavy and light industry customers. The company is a specialist contractor offering design and construction services related to bulk materials process and handling systems. Typically their customers operate in the aggregates, cement, building products, coal, food and chemical, minerals, power and recycling industries.

Health & Safety at Fairport Engineering Ltd has been a vital part of its workplace culture for many years. Excellence in this field has not been achieved overnight as can be seen in the company’s recently released accident statistics. These show an impressive and improving performance by the company and its sub-contractors over the last decade.

In its own right Fairport can claim a headline performance that includes, over the last 10 years, an average of over 175,000 hours worked provided by some 80 members of company staff that did not record any LTA’s (Lost Time Accidents). Equally, Fairport’s sub-contractors have provided on average 110,000 hours per year worked over the last decade with an annual average Incidence Rate of 3.0 (LTA’s/1,000 Employees) : a third lower than the National Incidence rate. In specific terms, neither Fairport nor its sub-contractors have recorded an LTA for any of the last 4 years (2011 to 2014).

More recently, in 2014 and 2013, Fairport completed capital projects worth some £50,000,000. Over this period the Health and Safety team managed multiple on site workforces, totalling in excess of 100 employees and subcontractors, who concurrently constructed, completed and handed over all the works with Zero Reportable Accidents & Zero Dangerous Occurrences.

These projects were challenging but successfully delivered against demanding delivery schedules. According to Fairport Engineering’s Operations Director, Ian Tole, the key to ensuring continued safe working on site is with a continuous programme of training, positive leadership and effective communication” and went on to comment, “We encourage all the people on our construction sites to make safe choices for themselves and for their work colleagues.”

By way of example, in 2014/13 Fairport Engineering constructed a state of the art recycling facility for a leading UK metal recycling company. The construction phase involved the management of 84 employees, at peak, operating within an enclosed portal frame building. Space restrictions within the building led to Fairport Engineering managing an installation programme for process equipment not only at mezzanine floor level but within the buildings’ roof space.

Working at height is a hazardous activity under normal outdoor ambient circumstances. In high summer the working temperature under the roof became significant. such that daily Health & Safety briefings were delivered for this aspect of the works. As a result, in August 2013, 16,454 hours of work were undertaken without a reportable or lost time incident; this outcome can undoubtedly be attributed to the development of, and adherence to, a work regime appropriate for elevated confined spaces.

In 2013 Fairport Engineering designed and constructed a light weight aggregate plant, working adjacent to the largest fossil fuelled Power Station in the UK, at Drax, North Yorkshire.

To win this contract Fairport designed a novel materials handling system, meeting a competitive budget schedule, whilst mindful that its site works would need to operate in parallel with Drax’s stringent Health and Safety requirements. Up to 55 people were managed on site at any one time during the construction phase generating over 91,000 hours of delivered work over a period of 10 months. During this period there were no LTA’s and as a result of this efficiency the project was completed on time and in budget.

To learn more about Fairport Engineering’s capabilities and expertise please contact : Tel :  +44(0)1257 484043